This interim report summaries the results of the work on WP1 to WP11, which were scheduled to be completed by the time of the interim report. For detailed information on each work package please look at the full text on each work package in the appendix. These full text are draft versions of the first eleven work package chapters for the final project report.
In addition to summarising the results achieved so far the interim report looks at the work and time plan of the project and suggests necessary adjustments due to substantial delays in the final acceptance of the inception report, which was delivered to the Energy Devision as a draft in November 2016. Due to a lengthy process of approval it has taken until mid February 2017 to receive the final approval of the inception report.
This interim report suggests two additional visits of the consultant to Barbados in April and June 2017 to facilitate the final discussion of the report and the presentation and discussion of the key results.