ITB - Supply and Installation of Photovoltaic Systems (UPDATED Sep 26 2016) PDF Print E-mail

The Division of Energy and Telecommunications, Prime Minister’s Office, now invites sealed tenders from eligible and qualified bidders for the Supply and Installation of Grid Tied Photovoltaic (PV) Systems on thirteen (13) Government Buildings, the aim of which is to reduce Barbados’ dependence on fossil fuels by promoting Renewable Energy (RE) in the public sector. The delivery and installation period is estimated to be over a period of six (6) months.

Deadline for response: WEDNESDAY, 26TH October, 2016 - 4:30 p.m.

Download full Invitation to Bid document here: icon ITB - Supply and Installation of Photovoltaic Systems (235.42 kB)

icon See all Queries and Clarifications (305.18 kB)

 

Supporting documents:

 

Energy Tip!

Plug home electronics, such as TVs and DVD players, into power strips; turn the power strips off when the equipment is not in use (TVs and DVDs in standby mode still use several watts of power).