ITB - Supply and Installation of Photovoltaic Systems (UPDATED Sep 26 2016) PDF Print E-mail

The Division of Energy and Telecommunications, Prime Minister’s Office, now invites sealed tenders from eligible and qualified bidders for the Supply and Installation of Grid Tied Photovoltaic (PV) Systems on thirteen (13) Government Buildings, the aim of which is to reduce Barbados’ dependence on fossil fuels by promoting Renewable Energy (RE) in the public sector. The delivery and installation period is estimated to be over a period of six (6) months.

Deadline for response: WEDNESDAY, 26TH October, 2016 - 4:30 p.m.

Download full Invitation to Bid document here: icon ITB - Supply and Installation of Photovoltaic Systems (235.42 kB)

icon See all Queries and Clarifications (305.18 kB)

 

Supporting documents:

 

Energy Tip!

Many appliances continue to draw a small amount of power when they are switched off. These "phantom" loads occur in most appliances that use electricity, such as VCRs, televisions, stereos, computers, and kitchen appliances. In the average home, 75% of the electricity used to power home electronics is consumed while the products are turned off. This can be avoided by unplugging the appliance or using a power strip and using the switch on the power strip to cut all power to the appliance.